News

Built & Launched is a brand-new registry dedicated to preserving the boats people build and the stories behind them. Help us grow the fleet—add your home-built boat and become part of the registry from the beginning.

View Photograph

Built & Launched Registry

AWOOGA

Candu E-Z · Mini Tug


Registry No.
BL-000001
Hailing Port
Clinton, CT, United States
Launched
27 April 2025

Launched / Active

At a Glance Registry particulars
Builder
Adam Riso
Design
Candu E-Z
Length
14′ 3″4.3 m
Launched
27 April 2025
Hailing Port
Clinton, CT, United States

CANDU-EZ Mini Tugboat

The Story

In the builder’s words

AWOOGA is a hand-built wooden mini tugboat, 14 feet 3 inches of marine plywood, fiberglass and epoxy with the voice of a freighter. The idea struck in 2010, when builder Adam Riso met a little tug named TooT TooT at the Mystic WoodenBoat Show and his wife said, “You can build that next.” Twelve years of planning and three years of garage nights later, AWOOGA launched into Clinton Harbor, Connecticut, on April 27, 2025. She has since appeared in WoodenBoat’s Launchings and Small Boats magazine, and lives online at awoogatug.com, where visitors can sound her horn, replay her voyages, and inspect every receipt of the build.

Vessel Website Visit Vessel Website

Build Progress

10 of 10 stages complete

100% 10 of 10 stages (4 not applicable to this boat)

  1. Complete 5 September 2026

  2. Complete 1 April 2023

  3. Complete 6 August 2026

  4. Complete 6 August 2026

  5. Complete 6 August 2026

  6. Complete 1 April 2025

  7. Complete 6 August 2026

  8. Complete 10 September 2026

  9. Complete 1 April 2025

  10. Complete 27 April 2025 From her record

The Build

17 milestones, in order

  1. AUGUST 2022

    The Build Begins

    From her record From her record

  2. SEPTEMBER 2022

    The bottom panels take shape

    Hull

    Four sections of Meranti marine plywood became AWOOGA's bottom. I laid out the curves with a fairing strip, cut the panels, and routed shallow channels at the joints so the fiberglass tape could sit cleanly in the surface.

  3. SEPTEMBER 2022

    The fiberglass lesson

    Fiberglass

    The first attempt at glassing the bottom did not bond properly. The cloth's fine weave would not wet out the way I expected, so I pulled it all off, sanded the surface back, and started again. It was an early and memorable lesson: wet the wood first, then lay the cloth.

  4. OCTOBER 2022

    Bottom glassed and chine logs fitted

    Fiberglass

    The rebuilt bottom was sealed and glassed successfully. I fitted and epoxied the chine logs, set the bulkhead bases, flipped the assembly to expose the water side, and finished it with two layers of fiberglass cloth and epoxy.

  5. NOVEMBER 2022

    Building the keel frame

    Frames

    Work moved to the keel and side keels. I built the keel frame, dry-fitted its plywood skins, and glassed the inside faces. The enclosed space would later be filled with foam for flotation before the skins were sealed for good.

  6. APRIL 2023

    Keel sealed and bottom protected

    Fiberglass

    The keel cavity received flotation foam, then the keel and side keels were closed, sealed, faired, and glassed. Sanding the cured cloth was not a favorite job. I also coated the underside with three coats of truck bed liner for extra abrasion protection and rebuilt the trailer with new carpeted bunks.

  7. JUNE 2023

    Hull sides and deck structure

    Deck

    With the bottom on the trailer, the stem went in and the port and starboard hull sides were bonded to the chine logs and held by side and stern jigs. Deck shelves, stringers, the forward deck, and the beginnings of the rub rail made the flat plywood finally read as a boat.

  8. AUGUST 2023

    The hull skin is complete

    Hull

    The stern skin needed patience and a recut from a template when the plan dimensions did not fit quite right. Once those pieces were on, every hull skin panel was complete. Fir rail caps and the forward rub rails finished the sheer, with thickened epoxy filling the inevitable imperfections.

  9. SEPTEMBER 2023

    Cutting the motor well

    Mechanical

    This was the scariest cut of the build: opening the finished stern and bottom for the motor well. I laid it out, cut the hull, glassed the well components, and installed the assembly. Final trimming would wait until the outboard was mounted and could be swung through its full range.

  10. OCTOBER 2023

    Glassing the outside of the hull

    Fiberglass

    The exterior received a sealing coat followed by two layers of fiberglass cloth. The port side behaved better than the starboard side, but both were wetted out, wrapped, and ready for the long cycle of fairing, sanding, primer, and paint.

  11. MAY 2024

    The cabin rises

    Cabin

    After months spent making the cabin bulkheads, hatch, and other pieces, I joined the cabin sides in jigs and raised the house on the hull. Roof beams, visor, roof skin, and helm station followed. AWOOGA had acquired the unmistakable profile of a pocket tug.

  12. JULY 2024

    Primer, paint, and scuppers

    Paint

    The exterior moved through fairing and primer into its finish colors - some lipstick on this pig, as the build notes put it. The hatch top and scuppers went on, and the cabin and helm components were laid out for final installation.

  13. SEPTEMBER 2024

    September 2024 - Motor, controls, and folding mast

    Mechanical

    The build gallery records this stage to September 2024; the individual workdays were not retained. The 20 HP Tohatsu was hung, the motor well trimmed for steering clearance, and the throttle, steering cable, controls, and wiring harness installed. I also redesigned the folding mast as a lever-action arrangement, following a tip from TooT TooT, so it could be raised and lowered more easily.

  14. OCTOBER 2024

    October 2024 - Cockpit seating and motor cover

    Interior

    The build gallery records this work from October through December 2024; the individual workdays were not retained. I built the aft cockpit seating over the gas-tank space and shaped a cover around the motor well. The fit-out turned the open after end into usable passenger space while keeping the mechanical installation accessible.

  15. APRIL 2025

    April 2025 - The launch list gets shorter

    Launch Preparation

    The build gallery records this final push to April 2025; the individual workdays were not retained. Window and door frames went in, the vinyl cabin floor was laid, the name decals and registration plate were installed, and St. Brendan the Navigator came aboard. A custom bow pudding from Mystic Knotwork was waiting for its place at the stem.

  16. 27 APRIL 2025

    AWOOGA launches

    Launch Day

    Three years of garage work reached the ramp. After a launch ceremony, AWOOGA rolled off the trailer, floated on her lines, pushed away from the dock, and made a proper little tugboat wake under her own power. Mike, the builder of TooT TooT - the boat that inspired this project - was there to see it. Pizza and a launch cake followed.

  17. SEPTEMBER 2025

    September 2025 - Full cartoon

    Modification

    The build gallery records these additions to September 2025; the individual workdays were not retained. AWOOGA gained perforated cartoon eye decals, logo stadium seats on folding supports, a mascot, and a working bubble stack made from PVC pipe, a toilet flange, and custom 3D-printed parts. The boat was finished; the personality was still under construction.

The Dockside Conversation

Notes on AWOOGA

Questions, encouragement, and hard-won building knowledge from the community.

0 comments

Start the conversation. Ask about the build, share a useful detail, or leave a word for the builder.

Add to the Log

Leave a comment

Be specific, generous, and useful. Your email is never displayed.

Plain text only. Keep personal information and private contact details out of public comments.

Published immediately; the builder can ask an administrator to review it.