15.5' old time southeast working skiff 5.5' old time southeast working skiff
Getting a place to build setup
Built & Launched is a brand-new registry dedicated to preserving the boats people build and the stories behind them. Help us grow the fleet—add your home-built boat and become part of the registry from the beginning.
Work in Progress
See what home boat builders are working on right now.
Everything the fleet has done lately, newest first.
Build Update Other
Getting a place to build setup
Photographs Under Construction
Half of the lower deck bulkheads are in!
Build Update Hull
The cedar-strip dinghy begins to come to life in a crowded workshop, its rich wood grain glowing beneath the warm light. With the interior taking shape and a row of clamps holding the gunwale in place, the photo captures the satisfying…
Build Update Hull
Work began on a still-unnamed cedar-strip dinghy, but a few months into the build, my daughter arrived and the project went into dry dock for a while. Eventually, I found my way back to it, adding one cedar strip at a time until the little…
Build Update Hull
Worked on forward gunwale supports. Working outside until heavy storms rolled in.
Build Update Hull
Working on rub rails today, hull structure completed except rails and glassing. No work done on interior yet except glassing and tons of sanding. Start of project before even ordering plywood was 4/1/2026 No comments about April 1 please.
Build Update Launch Day
Three years of garage work reached the ramp. After a launch ceremony, AWOOGA rolled off the trailer, floated on her lines, pushed away from the dock, and made a proper little tugboat wake under her own power. Mike, the builder of TooT TooT…
Build Update Fiberglass
Bottom glassed and chine logs fitted
The rebuilt bottom was sealed and glassed successfully. I fitted and epoxied the chine logs, set the bulkhead bases, flipped the assembly to expose the water side, and finished it with two layers of fiberglass cloth and epoxy. Source…
Build Update Frames
Work moved to the keel and side keels. I built the keel frame, dry-fitted its plywood skins, and glassed the inside faces. The enclosed space would later be filled with foam for flotation before the skins were sealed for good. Source…
Build Update Mechanical
This was the scariest cut of the build: opening the finished stern and bottom for the motor well. I laid it out, cut the hull, glassed the well components, and installed the assembly. Final trimming would wait until the outboard was…
Build Update Fiberglass
Glassing the outside of the hull
The exterior received a sealing coat followed by two layers of fiberglass cloth. The port side behaved better than the starboard side, but both were wetted out, wrapped, and ready for the long cycle of fairing, sanding, primer, and paint…
Build Update Deck
With the bottom on the trailer, the stem went in and the port and starboard hull sides were bonded to the chine logs and held by side and stern jigs. Deck shelves, stringers, the forward deck, and the beginnings of the rub rail made the…
Keep Looking
This page is the work, in the order it was done. The other two are the boats it is being done to, and everything else that has happened.
Your Bench
A boat can be entered in the registry the day the plans arrive. Add an entry when you have done an afternoon's work, and it appears here.