At a Glance Registry particulars
Builder
Mike D
Design
Candu E-Z
Length
15′ 9″4.8 m
Status
Under Construction
Hailing Port
Middletown, NJ, United States

Got to keep busy so why not build something with my grandson.

The Story

In the builder’s words

Semi-retired and as a hobby I like to work with wood, fiberglass, electronics and engines so the CANDU-EZ is perfect. I figure this project will take about 18 months and will bring years of fun with my grandson and granddaughter (who the boat is named after). The build is a WIP right now.

Builder Knowledge

Practical lessons from this build

What I Would Do Differently

I would cut and position the hulls a bit differently in order to flare the top of the bow about 1-2 inches wider than the bottom shape.

Most Difficult Part of the Build

I disliked cutting the longer thinner parts like the chine logs, rub rails and gunwales.

Best Modification

I added a 12in deep box keel to mount the diesel engine low enough to have the shaft almost flat.

Would I Build This Design Again?

I think one time will be enough

Build Progress

6 of 14 stages complete

43% 6 of 14 stages (1 not applicable to this boat)

Next Engine installed

  1. Complete 30 May 2026

  2. Complete 6 June 2026

  3. Complete 27 June 2026

  4. Complete 12 July 2026

  5. Complete 6 September 2026

    Includes bow stem, rub rail, hull panels, gunwales

    Hull structure complete

  6. Still to do

  7. Still to do

    Beams, sheathing and covering boards down.

  8. Still to do

    Coach roof, cockpit, hatches and anything standing above deck.

  9. Still to do

    Filled, faired, primed and finished — inside and out.

  10. Still to do

    Sole, berths, lockers, joinery and the fit-out.

  11. Still to do

    Engine, wiring, plumbing, steering and controls aboard and working.

  12. Still to do

    Spars, standing and running rigging, sails, oars or the outboard.

  13. Still to do

    The day she went in.

The Build

17 milestones, in order

  1. MAY 2026

    The Build Begins

    From her record From her record

  2. JUNE 2026

    The start of the build

    Plans

    Prior to the start i had been collecting miscellaneous parts and reviewing the plans on Berkley Engineering which i ultimately purchased (CANDU E-Z). I also purchased laminating epoxy, 6oz cloth, biaxial tape, cloth tape and ACX plywood for most of the build. All fasteners that I used were stainless steel.

    Before the build I also purchased a used Yanmar 1GM diesel engine, transmission, shaft, stuffing box and prop. I needed this to properly dimension out the box keel and engine placement

  3. JUNE 2026

    The bottom & box keel

    Frames

    Bottom and Box keel sized to accept engine and shaft length I had. From the start I decided to stretch the plans of the boat length by 18 inches (I will also add 2 or 3 inches to the cabin height). The depth is 12 inches and the sides of the keel are canted inward 15 deg to make it more streamlined. The keel’s displacement is a bit greater than the almost 200 lbs the engine, transmission, shaft and prop are. There are 3 bulkheads to separate the compartments in the keel. At this point in the build i simply had a leveled 10’ x 6’ 2x4 frame on the floor of my garage to ensure flat build.

  4. JUNE 2026

    Finished box keel and added longitudinal logs

    Frames

    Closed in box keel and added longitudinal logs. Already routed in the box keel are conduits for wire and cables. I also fitted the engine mounts.

  5. JULY 2026

    Completed glassing of bottom and added stainless guard on bottom of keel.

    Frames

    Completed glassing of bottom and added stainless guard on bottom of keel. There are 4 layers of 6oz cloth minimum on the bottom with 6 to 8 layers on all inside and outside corners (including 1 layer of biaxial/mat).

  6. JULY 2026

    Flip the bottom

    Frames

    Flipped the bottom with some help. Since there was now a keel the platform I built had to be raised and wheels were put on it so I could move the boat.

  7. JULY 2026

    Open Access to keel

    Frames

    Cut access to engine compartment and keel compartments.

  8. AUGUST 2026

    The hull takes shape

    Hull

    The bow stem was installed, hull sections measured, cut and butt joined. Then the hull sections were fitted. This was a major milestone for me because now visitors checking on what I was doing believed it was really a boat!

    (Don’t mind the messy shop. Every week or so I do a cleanup…..most of the time).

  9. AUGUST 2026

    Gunnel and lower shelf supports installed

    Hull

    Gunnel and lower shelf supports installed

  10. AUGUST 2026

    Bow gunnels

    Hull

    Bow gunnels installed

  11. AUGUST 2026

    Rear rubrail-lower and lower stern curved sections

    Hull

    Lower half of rear rubrail installed along with the lower curved stern sections. This took some time to trim and properly fasten, but it looks great!

  12. AUGUST 2026

    Rear Rubrail - upper

    Hull

    Rear Rubrail - upper installer

  13. AUGUST 2026

    Miscellaneous side projects

    Other

    Along the way my attention gets drawn to some other related side projects. Here are a few;
    Old truck air horn restoration
    Shift / throttle controls
    Name plates

    After restoring these air horns I come to find they work on vacuum , which a diesel engine does not have. I purchased an electric brake booster vacuum pump to run them.

  14. AUGUST 2026

    Clean the garage day

    Other

    Rolled the boat outside today in order to clean the dust and re-organize the tools, etc. Also 1/4 round routed the bottom edge of the hull.

  15. SEPTEMBER 2026

    Aft gunwale support and stern curved panel

    Hull

    Getting close to another milestone ….. aft gunwale support and stern curved panel

  16. SEPTEMBER 2026

    Engine basic maintenance and cleanup

    Mechanical

    Tore down parts of the engine so it could be cleaned and repainted. Also did all the basic maintenance. Soon I will move it into place in order to align the shaft and plan out position, muffler, fuel system, dash wiring, etc.

  17. SEPTEMBER 2026

    Hull structure complete

    Hull

    Hull structure complete. Fitted the final curved stern panels. It looks great and happy with the symmetry and shape. There still a lot of tabbing, filets and fairing to be done, but it’s another milestone in my book.

The Dockside Conversation

Notes on KATE

Questions, encouragement, and hard-won building knowledge from the community.

0 comments

Start the conversation. Ask about the build, share a useful detail, or leave a word for the builder.

Add to the Log

Leave a comment

Be specific, generous, and useful. Your email is never displayed.

Plain text only. Keep personal information and private contact details out of public comments.

Published immediately; the builder can ask an administrator to review it.