News

Built & Launched is a brand-new registry dedicated to preserving the boats people build and the stories behind them. Help us grow the fleet—add your home-built boat and become part of the registry from the beginning.

View Photograph

Built & Launched Registry

TBD

Passagemaker Dinghy


Registry No.
BL-000006
Hailing Port
Greece
Status
Under Construction

Under Construction

At a Glance Registry particulars
Builder
Norm Johnson
Design
Passagemaker Dinghy
Status
Under Construction
Hailing Port
Greece

CLC’s famous sail and oar dinghy

The Build

5 milestones, in order

  1. SEPTEMBER 2022

    The Build Begins

    From her record From her record

  2. FEBRUARY 2024

    Early Days

    Plans

    I purchased the plans from Fyne Boats in the UK (CLC agent) in 2022 but didn't start building until 2024. I live part time on an Aegean Island and finding and collecting the right materials can be difficult and expensive. I finally located some marine plywood that was made in Greece and found the one shop on the island with a limited selection of West System epoxy and filler. (Building the whole boat with 105 resin, 206 hardner, and 407 filler because that's what they have.) I had to buy the fiberglass in the States to get the 6oz woven. Anyway, some images building a work table, perusing the plans, and inspecting our plywood.

  3. AUGUST 2026

    Completed fillets on hull exterior

    Hull

    All wires have long been removed after the hull was tacked together with epoxy dabs between wire locations. The boat had been stored for the winter in an old garage, while I returned to the US for a few months. Even though I had covered her with waterproof tarps some water had infiltrated. I was worried about damage to the marine plywood but everything seemed ok other than some discoloration due to water and some surface mold. Going for a painted workboat finish anyway so I give the hull a sanding and faired out the plank joints taking care to rough up the old epoxy "stiches". After a few hours prep, I laid in the thickened epoxy to fill the length of each lap joint. Took a couple of mornings to get that done in anticipation of glassing the bottom panel.

  4. AUGUST 2026

    Some fiberglass work

    Hull

    Several days work on hull and daggerboard trunk. I throw a tarp over the boat after working whenever possible to keep our seasonal visitors from making a mess. Swallows above a build have to be a good sign!

  5. AUGUST 2026

    Daggerboard trunk and seats

    Hull

    Turned the boat over. Built, fiberglassed, and epoxied the daggerboard trunk pieces. Test fitting the trunk and seats getting ready to coat all enclosed areas with epoxy prior to install. Epoxied the skeg pieces together to get ready for installation once I turn the boat back over. Nice thing about this build is how easy it is to turn the boat as it is quite light. It has been warm, 32 to 36c so working slowly but enjoying the process.

The Dockside Conversation

Notes on TBD

Questions, encouragement, and hard-won building knowledge from the community.

0 comments

Start the conversation. Ask about the build, share a useful detail, or leave a word for the builder.

Add to the Log

Leave a comment

Be specific, generous, and useful. Your email is never displayed.

Plain text only. Keep personal information and private contact details out of public comments.